Shore Damage at Hammond Bay Harbor, 1962-76
Scope
This entry rests on one federal report: U.S. Army Engineer District, Detroit, Final Environmental Statement: Mitigation of Shore Damage Attributed to the Federal Navigation Structures at Hammond Bay Harbor, Michigan, dated November 1976, with a summary revision stamp of April 14, 1977 [1, PDF p. 3]; [1, PDF p. 4]. The work is "in the vicinity of Hammond Bay Harbor, Presque Isle County, Michigan" [1, p. i]. "The navigation structure is situated in Bearinger Township" [1, p. 17]. The report is a proposal to mitigate erosion; whether the groin was later built is not shown. Construction dates, the length of the damaged reach, and how much of the erosion is attributed to the harbor are each given in more than one way, and those versions are kept separate. A 1990 population figure is a 1976 projection, not an outcome. Numbers were checked on the page scan.
A harbor of refuge, and a changing shore
Hammond Bay was "one of 21 harbors-of-refuge," a program authorized by the River and Harbor Act of March 2, 1945, with harbors "not more than 30 miles" apart [1, p. 22]. "There were no harbor structures of any kind in the area" before the federal work. "Construction was initiated in 1962 and completed on 4 June 1965." There are two rubble-mound breakwaters [1, p. 22]. Elsewhere the same report says "Since 1963, when the Hammond Bay breakwaters were constructed," and "Before harbor construction (in the early 1960's)" [1, p. 55]; [1, p. 2].
The harbor is about 21 miles northwest of Rogers City and 20 miles southeast of Cheboygan, "a harbor of refuge for small craft." "No commercial usage occurs" [1, p. 2]; [1, p. 24].
Since the breakwaters, a sand spit and fillet formed to the south while the shore to the north receded. A structure visible in 1961 aerial photographs "is no longer standing," "lost to the advancing lake." Two residences about 1,200 feet north were threatened. Between 1963 and 1973 the shore moved landward about 120 feet at the worst point. U.S. 23 lay "just over 100 feet" from the shore. Lake Huron fell to a recent low in winter 1964, then rose to its "highest level in 21 years" by 1973, which made the erosion look "much more severe" [1, p. 55].
The damaged reach is described in three ways that are not merged here: "a 4,000-foot" stretch of changed shore; "the 2,500 foot reach" north of the west breakwater that is treated as attributable; and "a reach about 1,800 feet" long "from Pond Point to a point 700 feet" north of the harbor, with the southerly 450 feet the worst [1, p. 2]; [1, p. 1]. "It is clear that the Hammond Bay Harbor navigation structures have caused changes in the adjacent northerly shoreline." No clear effect was found south of Highway Point [1, p. 56]. The summary says the erosion "is wholly attributable to the harbor structure" [1, p. i]. Alternative 1 says "a portion of the shore damage is attributable" [1, p. iv]. Section 111 covers only erosion "in excess of the natural rate" [1, p. 1].
The township, a workshop, and a proposed groin
Section 111 (Public Law 90-483, August 13, 1968) makes the United States bear the cost of mitigating damage caused by federal navigation works. "A public workshop was held in Rogers City on September 16, 1976" [1, p. 1]; [1, p. 16].
The proposed plan was a rubble-mound groin about 150 feet long, filled with 3,000 cubic yards of imported material, giving a beach 60 feet wide and 450 feet long, built with "about 415 truck-loads" [1, p. i]; [1, p. ii]; [1, p. iii].
Bearinger Township had "50 persons in 1960 and 67 persons in 1970." Presque Isle County lost 2.1% in 1960-70, while a 51.4% gain, to 19,438, was projected by 1990 [1, p. 30]. "As of May 1976, no regulatory actions had been taken by Presque Isle County or by Bearinger Township" [1, p. 117].
Single 1976 EIS with 1977 summary revision; Bearinger Township; construction 1962-65 kept beside "Since 1963"; 4,000 / 2,500 / 1,800-foot reaches kept separate; "wholly attributable" vs "a portion"; the groin is a proposal, not an outcome; 19,438 by 1990 is a projection
Sources
- “Final Environmental Statement: Mitigation of Shore Damage Attributed to the Federal Navigation Structures at Hammond Bay Harbor, Michigan.” U.S. Army Engineer District, Detroit; DTIC accession AD-A100486; digitized by the Internet Archive, November 1976, with a summary revision stamp of April 14, 1977. The report documentation page says "Approved for public release; distribution unlimited." In the main text, add 19 to reach the PDF page through at least printed p. 56 (printed p. 1 is PDF 20; printed p. 55 is PDF 74). By printed p. 85 the offset is 20 (printed p. 85 is PDF 105; printed p. 117 is PDF 137). Summary pages i through iv are PDF 4 through 7 and are cited as printed roman numerals. Internet Archive scan (PDF) · Archive status not checked ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21 ↩22 ↩23 ↩24
Compiled with AI assistance from the cited sources and checked claim by claim against them. Images, where shown, are credited in their captions. Spotted an error? See corrections.